Development Tests / Internal Product Control

  1. Receipt of the client’s request by the Sales Department
  2. Receipt of samples to be tested
  3. Preparation of a quotation
  4. Signature of the quotation by the client
  5. Conducting tests
  6. Preparation of a test report
  7. Transmission of the test report to the client
  8. Recovery of tested samples by the client
  9. Archiving of the file